
Location: Indonesia Bantam
Capacity: 1 T/H
On January 25, 2026, the Indonesian Bantam coconut peat drying project entered its second day of equipment commissioning. The project targets high-moisture coconut peat raw materials with a moisture content of 65% in the local area, aiming to stabilize the finished product moisture content at ≤18%, with a designed capacity of 1 t/h. Commissioning work focused on the stability of equipment operation and the achievement of drying targets, laying the foundation for subsequent large-scale production and the efficient drying and resource utilization of cocopeat.
Please tell me your inquiry. We will give you best design and price.
The Jiutian one-stop solution system covers all aspects including solution design, equipment production, goods transportation, after-sales service, etc., to create a perfect project for you in all aspects.
Provides timely and professional online support to understand customer needs
Customize design production solutions according to your needs
Manufacture excellent performance, durable, reliable equipment.
All equipment undergoes strict testing and inspection before delivery.
Experienced engineers install equipment and commissioning for full production.
A professional after-sales team provides continuous technical support.
From solution design to equipment manufacturing and on-site installation and commissioning, Jiutian provide complete one-stop services. The equipment is exported to over 100 countries including UK, Russia, Malaysia, the Philippines, Italy, Israel, Indonesia, Malaysia, Ethiopia, Nigeria, Congo, South Africa, Pakistan, India, Egypt, etc. Looking forward to cooperating with you. The following is the project site of our client.